Table 12: B8ZS Standard (Non-HDSL) Spans - Provisioning
Required Tests General Information Parameters
DB Loss Test Unframed all ones pattern sent from CO
or remote test system. Measurements at
NI.
0 to -16.5 DB
Span Current
NOTE:
Current measurement test is not re-
quired when the span is fiber out to
the customer site and the smartjack
is located in the same bay or adja-
cent bay as the mux and is locally
powered by the same power plant as
the mux.
Use a volt meter that measures voltage
with at least 2 decimal point accuracy.
On a smartjack or NCTE, measure the
voltage between the two test points
labeled current or voltage.
Voltage meaurement must be 0.6
VDC +/- 0.03 volts to equal 60ma.
Current measurement if taken in
milliamps must be 60 ma +/- 3ma.
QRSS
1 five minute test
test pattern 0 errors
1 in 8
1 two minute test
test pattern 0 errors
All Ones
1 two minute test
test pattern 0 errors
All Zeros
1 thirty second test
test pattern 0 errors
Bridged Tap
test run on copper portion of spans only
when errors are detected on other
stress patterns
21 test patterns (test sets are pro-
grammed to run these tests)
Only use this test on copper spans.
0 errors
AT&T Practice ATT-TP-000-000-006
Issue 1, 08/25/06
2006 AT&T Knowledge Ventures. All rights reserved
18
Comentarios a estos manuales